← All guides

When should AC pipework be planned during renovation?

Choose indoor and outdoor unit positions before closing walls and ceilings.

The proposed route, permitted pipe length, drainage and electrical supply must match the chosen unit and building conditions. Confirm the model and manufacturer requirements before fixing concealed lines.

Document hidden routes with photos for later maintenance. Installation and commissioning should be carried out by suitably qualified people.